Simole
and secure
As a rule there are never enough helpers
available for the performance of catastrophe measures. Herein lies
the advantage of Aqua Barrier. Its geniality is its simplicity.
It is important to have a system available which can be used at any
time and by anybody. The individual components are designed in such
a manner that the transport (weight) to place of use is possible almost
everywhere without additional auxiliary means.
Pallet support - EUR-palett
- membrane
This foldable and thus space saving
construction constitutes the heart of the overall system. The further
components of the installation can be obtained on the
market at any time.
Attention was paid to using special parts as little as possible.
Rapid availability in the event of a catastrophe would no longer
be assured with expensive special expensive components.
The EUR pallets are easy to obtain. There are millions in our circular
flow economy and these are therefore available at all times. In
addition they have been tested for stress bearing capacity and as
a result contribute towards the functional safety of theinstallation.

Function and construction
The pallet support is laid out and
sent up in the respective grid of the pallets in accordance with
therequired dam height of 0.65 or 0.95 metres. As a rule
anchoring is not necessary. The EUR pallets can now belaid on.
Finally the membrane is laid on and secured. as a result of the
load - pallet weight and above all the water pressure - the support
claws into the respective
ground surface. The readiness for use has been established. "The
protective wall is standing!"

Dam heights
It is possible ton achieve two dam heights
in the first constructional stage. As a result of the dimensions
of the EUR pallets (1,200 x 800 mm) dam heights of
0.65 and 0.95 metres are obtained.
By means of additional components to be attached to the existing
system it is
possible to achieve a dam heigh of up to 1.80 metres. With this
construction heigh two EUR pallets stand edgewise on esch other.
Since this second constructional
stage is built onto the first one a raising of the heigh without
alteration of the basic protective dam is possible.

Tighness
The membrane is dimensioned in such
a manner that there is sufficient opportunity of securing this accordingly
in front of the EUR pallet. This can be done by stickinug into the
turf or by corresponding load e.g. sand bags, stones or similar.
Depending on the ground underneath an extremly high tighness is
achieved; thus the ability to move behindthe wall is still given.

Advantages through cost savings
Reduction ...
- of the number of people used
- of the setting up and dismantling time
- of the cleaning and clearing up expense
- of the storage capacity
- of the maintenance costs
No additional...
- people required for the
- procurement costs for example for filling machines
- servicing costs
- one-off cleaning following use is sufficient.
A further advantage of Aqua Barrier not to
beunderestimated is the low weight of the protective wall. The weight
(support, pallet and membrane) per metre is considerably lower compared
a result of the use of Aqua Barrier as an increase in dike height
for example, a reduction in the burfden on the dike is achieved.

|